Improvements Happening at the Home

CLOSED: This discussion has concluded.
  • Hot Water Boiler replaced
  • Planning to replace the HVAC that serves the laundry room.
  • Two (2) Walk-in Cooler condensers are being replaced this year.
  • The New Generator is on schedule to be installed in the fall; the concrete pad will be installed soon.
  • The Emergency Evacuation Ramp from the Oak Home Area will be replaced to match the ramp on the far side of the home.
  • Gazebo to be installed for residents that smoke at the front of the home to provide shelter that is at least 9 meters away from the front door.
  • New bathtubs have now been installed in our Maple and Birch tub rooms. These state-of-the-art bathtubs feature a technology called Hydrosound.
Share Improvements Happening at the Home on Facebook Share Improvements Happening at the Home on Twitter Share Improvements Happening at the Home on Linkedin Email Improvements Happening at the Home link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>